Skip to content
Free wastewater assessment
Wastewater treatment works

Reducing odours and improving irrigation effluent at a private wastewater treatment works

The treatment works needed to improve the biological process without rebuilding the plant.

LocationPrivate golf-course wastewater system, South Africa
Project visual for Reducing odours and improving irrigation effluent at a private wastewater treatment works

Project overview

Site challenge and treatment summary.

The treatment works needed to improve the biological process without rebuilding the plant.

Initial problem
A privately operated wastewater treatment plant discharged treated water into a dam used to irrigate a golf course, with poor clarity and strong sewage odours reported.
Baczyme product used
Baczyme Sewage Liquid+
Dosage
A dosing station was installed after the wastewater-screening stage and before the aeration and digestion tanks, reportedly dosing 1.5 L of Baczyme Sewage Liquid+ into approximately 1.5 million L of raw sewage each day.
Treatment period
One-month observation period

Site conditions

What Baczyme was responding to.

  • Reported plant flow was approximately 1.5 million litres per day.
  • Residents complained about strong sewage odours from the treatment works and irrigation system.
  • Effluent was discharged into a dam used to irrigate a golf course.
  • Effluent was reported as not sufficiently clear before treatment.

Treatment objectives

What the programme aimed to support.

  • Reduce sewage odour
  • Improve effluent clarity
  • Support irrigation-water quality
  • Accommodate the site's wastewater load

Before and after

Reported project progression.

These notes summarise the before-and-after information available for this specific Baczyme project.

Strong sewage odours and poor irrigation-dam visibility were reported before treatment.

Baczyme reported odours disappearing within approximately two weeks and dam visibility improving within one month.

Reported outcomes

Baczyme reported that foul odours disappeared within approximately two weeks and visibility in the irrigation dam improved from zero to approximately two metres within one month.

The reported capacity increase, effluent improvement and irrigation suitability require supporting flow records and laboratory results before being used as verified engineering-performance claims.

Test results or documents

Baczyme states that its characterised microbes allowed a 50% increase in raw-sewage inflow while releasing better-quality effluent. This claim should only be published after plant-flow records and full test data have been verified.

Project significance

Why this project matters.

This is one of Baczyme's strongest B2B case studies because it demonstrates integration into an existing treatment process at a reported flow of approximately 1.5 million litres per day.

Related product

Baczyme Sewage Liquid+

View product

Operating a wastewater treatment plant?

Discuss plant flow, odour, effluent quality and current process conditions with Baczyme.

Discuss a similar project